Feedback

HEC-Ecole de gestion de l'Université de Liège
HEC-Ecole de gestion de l'Université de Liège
MASTER THESIS
VIEW 90 | DOWNLOAD 0

Amélioration des processus de production d'une entreprise aéronautique

Download
Lejeune, Justine ULiège
Promotor(s) : Crama, Yves ULiège
Date of defense : 18-Jun-2019/20-Jun-2019 • Permalink : http://hdl.handle.net/2268.2/6440
Details
Title : Amélioration des processus de production d'une entreprise aéronautique
Author : Lejeune, Justine ULiège
Date of defense  : 18-Jun-2019/20-Jun-2019
Advisor(s) : Crama, Yves ULiège
Committee's member(s) : Collignon, Amandine ULiège
Deneye, Pierre ULiège
Zhan, Huan 
Language : French
Keywords : [en] Lean Management, Six Sigma Project, Aeronautics, ISO 9001, DMAIC
Discipline(s) : Business & economic sciences > Production, distribution & supply chain management
Target public : Student
Institution(s) : Université de Liège, Liège, Belgique
Degree: Master en ingénieur de gestion, à finalité spécialisée en sciences et technologies
Faculty: Master thesis of the HEC-Ecole de gestion de l'Université de Liège

Abstract

[en] Customer satisfaction has become a norm: product quality, on-time delivery and competitive prices are prerequisites for long-term business relationships.
The projects exposed in this thesis aim to advance the issue of non-compliance with deadlines identified in an aeronautical company, Britte-Mustad, by improving its production processes through the DMAIC methodology.
The first project intends to improve the transmission of information on the arrival of workpieces in the various sectors of the workshop. The suggested solution to achieve this goal is the implementation of a table inspired by the Kanban method of the Lean production system. This thesis studies the implementation as well as the problems encountered such as resistance and change management as well as how to deal with them.
The second project aims to improve the protection and identification of workpieces in order to reduce the risk of alteration during the manufacturing process. The considered solution consists in the acquisition of new packaging for the internal transport of workpieces. This thesis presents a comparative study of the solutions proposed by suppliers and describes the steps followed to lead to decision-making.
For the company, both studies must be the beginning of a series of projects following the same approach to achieve concrete results.


File(s)

Document(s)

File
Access Mémoire FINAL.pdf
Description:
Size: 3.9 MB
Format: Adobe PDF

Author

  • Lejeune, Justine ULiège Université de Liège > Master ingé. gest., à fin.

Promotor(s)

Committee's member(s)

  • Total number of views 90
  • Total number of downloads 0










All documents available on MatheO are protected by copyright and subject to the usual rules for fair use.
The University of Liège does not guarantee the scientific quality of these students' works or the accuracy of all the information they contain.